Document it & Document It
• Documentation helps you in
• Better understanding of the customer requirements
• Complete control on the Project deliverables
• Milestone signoffs
• Keeping the records for future implementations
• Better communication between Technical & Functional team
Document
Check list in a Implementation |
|
KICK
off & Planning: |
|
PIK0001 |
Kick
Off Presentation |
PIK0003 |
Resource
Matrix |
PIK0004 |
Complete
Project Plan with Tentative Dates |
PIK0005 |
Project
Deliverables dump |
PIG0001 |
Minutes
of Meeting |
PIG0002 |
Kick
Off Signoff Document |
FRD
or As Is/To Be or Requirement Analysis |
|
PIG0001 |
Minutes
of Meeting for every meeting |
CRP
Server Installation Report |
|
PIF0001 |
As-IS
document |
PIF0002 |
FRD
Document/ To Be Document |
PIF0004 |
Gap
Analysis Sheet |
PIF0005 |
Customization
List |
PIG0002 |
Key
User Training Sign Off |
List
of the Reports /Formats Required By customer |
|
CRP |
|
As per ERP |
Master
Data Collection Formats |
PIC0001 |
Show
case scenarios |
PIC0002
|
CRP
Presentation |
PIG0003
|
Issue
List |
PIG0004
|
Gap
Analysis Sheet |
PIG0005
|
Functional
Specification for Customizations |
PIG0002
|
CRP
Signoff |
Development |
|
PID0001 |
Dev
Server Installation Report |
PIG0006 |
Technical
Specification for customization |
PID0002 |
Configuration
Document |
PID0003 |
Test
Scenarios |
UAT |
|
PIU0001 |
Production
Instance Ready Report |
PIU0002 |
Key
User Sign of on UAT Scenarios |
PIG0003 |
Issue
List |
PIG0004 |
Gap
Analysis Sheet |
PIL0001 |
Go
Live Check List |
PIU0003 |
Conversion
Format |
PIU0004 |
Conversations
Test Report |
PIG0002 |
UAT
Sign Off |
Go
Live/ Cut Over |
|
PIG0002 |
Gap Analysis
Sign Off |
PIL0003 |
Change
Process Intimation |
PIL0004 |
End
User Training Schedule |
End
User Manual/Video |
|
PIG0002 |
Master
Data Upload Sign Off |
PIG0002 |
Opening
Balance Upload Signoff |
PIG0002 |
Issue
List Sign Off |
System
Ready Report |
To
Dos & Not To Dos
•
Kick Off
To
Do |
Not
To Do |
Prepare
all the documents |
Avoid
any discussion on the functionality |
Focus
on the responsibility of the Customer |
Do
not open the Product |
Please
share challenges and your experience |
Do
not make customer uncomfortable by using complicated terminology or short
words |
Create
a vision in from of the customer about by putting example of successful
stories. |
Avoid
negative discussions on the failures and handle objections by parking them
for handling in later phase. |
Requirement/AS-IS
Study
To
Do |
Not
To Do |
Record
your conversations/ Or write on the note pad |
Do
not open the product |
Try
to create flow diagrams on white board or note pad for better understanding |
Do
not show your knowledge bank and do not discuss the solution at all. |
Ask
straight questions to make sure the key user opening up, you can achieve this
by explaining him/her the purpose of this discussion. |
Avoid locking horns on discussion points |
Collect
all the formats/Reports from key user & give them a code along with
listing in the report list. |
Do
not keep any assumptions seek clarification
if you are not clear on the process |
FRD/To-Be
Analysis
To
Do |
Not
To Do |
Key
User Training at a high level on the product |
Do
not randomize the report customization, please follow the priority. |
Involve
key users in the solution discussions |
Do not start customization with out signoff from the key user. |
Prioritize
the list of formats and Reports to handover to technical team. |
Avoid
taking your own assumptions, involve key user in all discussions |
Explore
all possible solutions before recommending any customization. Discuss
indentified gaps with senior team. |
|
For
customizations please refer the scope of work clearly defined in the
proposal. Seek change request approval as per scope. |
|
Please
collect all the master data for first cut. |
CRP
To
Do |
Not
To Do |
Prepare CRP server separate from the Test server. |
Do not do CRP on the test server. |
Keep the dump of the CRP before starting the
transactions. |
Avoid showing the complex screen or process during
CRP as it creates a panic. |
Try to prepare a CRP script. |
|
For unfinished customizations please prepare the concept note or
dummy screens to seek quick approval. |
Avoid mentioning this will be done that is
understood etc.. |
Ensure a meeting invite is sent to all stake
holders and confirmation has been taken. |
Avoid showing transactions during CRP as it might
sound complicated. |
Please conduct CRP as a presales, showing easiness
in the system by preparing the different roles/users and pre defined
transactions. |
Development
To
Do |
Not
To Do |
Always
prepare a separate server for development. |
Avoid
modifying source code as much as possible. |
Please
ask for functional specifications and test cases from func
consultant |
Avoid
partial delivery without testing |
Always
prepare a technical approach document before starting development |
|
Try
to create a layer of customization around standard solution. |
|
Keep
versioning of all the modifications which will help in control. |
UAT
To
Do |
Not
To Do |
Configure
based on the Configuration Document. |
Avoid
picking sample data. |
Test
& Upload the master data along with the sample opening balances |
Do
not do UAT on the CRP/Dev/Test server. |
The
environment should be real replica of the production to be. |
Avoid
splitting UAT in multiple functions |
Create
users roles and responsibility |
Avoid
multiple UAT instances |
Assist
key users in preparing the test scripts as detailed as possible. |
|
User
should pick some real transactions for this testing |
|
Prefer
to have testing in the joint conference among all functional key users |
Go Live
To
Do |
Not
To Do |
Please
preapare a detailed to-do for the go live. Day to
day morning call is best tool to track the progress |
Do
not leave data collection at the mercy of the Users or Customer. Please go
one step extra to ensure that given data is valid and correct. |
Ensure
all UAT scenarios are signed off and issue/gap has been agreed with the users
or road map has been defined for the critical issues/gaps. |
NO
ASSUMPTIONS PLEASE..Put in extra efforts to cross
verify. No issue is silly hence shall be verified by simulation. |
Ensure
all formats have been tested across multiple locations. |
In
case of multi location the list should not focus only on the HQ issues. |
Data
back up has been taken on daily basis. |
|
Users
are aware of the support process post go live. |
Support
To
Do |
Not
To Do |
Please
read the Service Level Agreement before execution of the project. |
Do
not try to do lot of Hit & Trial and try to approach the senior
consultants. |
Always
prioritize the issue as per severity |
Never
change any thing on the production server, first
test the solution on the development server. |
Always
check the issue on the blogs or report to the OEM |
|
Keep
customer updated for the severity 1 issues |
|
Always
send the weekly report |
|
Make
sure customer is on active support |
Prudence is a Oracle/Microsoft Leading Partner for the ERP Implementation
with successful ratio of 95%. We follow a stringent methodology supported by
backup Project Management office. Please contact [email protected]
for implementation of :
·
Oracle E-Business Suite
·
Oracle People Soft
·
Fusion HCM
·
Fusion Taleo
·
Microsoft Dynamics
o NAVISION
o CRM